Contents Wiring diagrams Section: M54 Engine - Technical Training - System Diagnosis All sections

Phase 2 - Leak Detection BMW X5 E53

Phase 2 - Leak Detection

The ECM energizes the Change Over Valve allowing the pressurized air to enter the fuel system through the Charcoal Canister, The ECM monitors the current flow and compares it with the stored reference measurement over a duration of time.

Identifying Leak Detection Diagram. Scheme 539

Scheme 539: Identifying Leak Detection Diagram

Once the test is concluded, the ECM stops the pump motor and immediately de-energizes the change over valve. This allows the stored pressure to vent thorough the charcoal canister trapping hydrocarbon vapor and venting air to atmosphere through the filter.